If you are weighing up what to do with an unused chimney stack at your Eriswell property, understanding the materials involved and the honest pros and cons of each option will help you make the right call.
Call any time. Calls are answered day and night and passed straight to our roofers.
Taking down a chimney stack means dismantling the brickwork from the top of the pot down to just below the roofline. Once the stack is gone, the flue opening through the roof is closed and insulated, and the roof covering is reinstated so the area is fully weathertight. Scaffold is always required. Waste brickwork and mortar is removed from site as part of the job.
The materials used to make good the roof after the take-down are the part where choices genuinely matter. Getting this right determines how long the finished job lasts and how it looks.
After the stack comes down, you are left with a hole in the roof where the stack came through. This needs to be patched with tiles or slates that match what is already there, both in size and in colour. This sounds straightforward but it is often the most time-consuming part of the job.
On older properties, the original tiles may be long out of production. A good roofer will source reclaimed tiles or slates that are a close match. New tiles can look stark against weathered originals for the first year or two, though they do tone down over time. Reclaimed material blends immediately but needs checking carefully for condition before use.
Different roof coverings have different fixing requirements and behave differently when cut in around an irregular patch.
The tiles or slates are only the outer layer. Underneath them, the roof needs sarking felt and treated timber battens. Where the stack has been removed, the existing felt will almost certainly need cutting back and overlapping with new material. This is non-negotiable. Laying tiles over a compromised felt line is a false economy that leads to leaks within a few years.
Modern breathable roofing membranes perform better than the older bitumen-based felt in most situations. They allow moisture vapour to escape from the roof space while keeping liquid water out. If the surrounding roof has older felt, it is worth asking what condition it is in while the area is open.
Once the brickwork is down, the flue opening needs to be closed at ceiling level within the house. The options are:
If you are not doing a full take-down and are instead repairing an existing stack, lead flashing is the key material to understand. Lead is used to seal the junction between the stack and the roof slope. It sits in a chase cut into the brick and is dressed down over the tiles.
Code 4 lead (1.8mm thick) is the standard for most chimney flashing applications. Some roofers use Code 3 to keep costs down, but it has a shorter service life, particularly on exposed elevations. A properly dressed and secured Code 4 lead flashing, with the correct step and back flashing details, should perform well for many years under normal conditions.
Alternatives to lead include modern self-adhesive flashing tapes. These are sometimes used on lower-risk junctions, but they are not considered an equal substitute for dressed lead on a chimney. If a roofer quotes a flashing job using tape products only, ask why.
Whatever route you go down, there are a few questions worth putting to any roofer before signing off on the job. What material will be used to patch the roof? Will it be new or reclaimed? Is breathable membrane being used or older felt? What is the capping detail for the flue, and will there be any ventilation? These are not trick questions. A roofer who answers them clearly knows what they are doing.
If your Eriswell property has a stack you are unsure about, call Mildenhall Roofers and ask for a survey so we can give you a clear picture of your options and what each one involves.
No obligation · We'll call you to arrange a free visit
Call any time. Calls are answered day and night and passed straight to our roofers.