If you are wondering exactly what happens when exterior cladding is fitted to a home in Isleham, this page walks through the whole process so you know what to expect at every stage.
Call any time. Calls are answered day and night and passed straight to our roofers.
Exterior cladding protects your walls from rain, wind and cold while giving the building a clean, finished appearance. Mildenhall Roofers fit timber, composite, fibre cement and metal cladding systems to homes in Isleham and across the area. A lot of homeowners find that knowing what happens at each stage makes the whole project feel far less daunting.
So here is exactly how a cladding job runs, from the first visit to the day we pack up and leave your property tidy.
Before any price is discussed or any material is ordered, the existing wall surface has to be properly assessed. We look at the condition of the render, brickwork or existing cladding, check for any active damp or water ingress, identify where penetrations (windows, doors, pipes, vents, meter boxes) sit, and assess what the wall structure can carry in terms of fixing load.
This is the stage that separates a good installation from a poor one. Fitting cladding over a wall that has active damp, loose render or a failing damp-proof course simply locks the problem in. Any underlying issues need to be understood and addressed before the cladding goes on.
We also check access requirements at this point. A single-storey extension is a very different access proposition to a full two-storey gable elevation. Scaffold requirements are assessed here and included in the project plan.
Preparation is unglamorous but essential. Any loose render is hacked back to a sound surface. Spalled or damaged brickwork is made good. If there is any live water ingress, we identify the source before proceeding - pointing issues, failed flashings and defective guttering are the most common culprits, and any of these needs to be fixed before the cladding goes on.
The wall is then cleaned down. Algae, biological growth and contamination from old render or paint will prevent bonding and breathability if they are left in place. On properties where the existing surface is heavily contaminated, a biocide wash followed by a rinse is the right approach before the batten system goes up.
The cladding boards do not fix directly to the wall. A framework of treated timber battens (or in some systems, aluminium rails) is first fixed to the wall face. These battens carry the boards and create a ventilated cavity between the cladding and the wall surface. This cavity is what makes a rain-screen cladding system work - any moisture that gets behind the boards can drain down and dry out rather than soaking into the structure.
Setting out the battens correctly is a skilled job. They must be plumb and true in both directions - a board fixed to a batten system that is even slightly out of line will show the error clearly once the boards are up. The fixing centres for the battens must also be correct for the chosen board material, since different boards have different mid-span limitations.
Where a thermal insulation layer is specified, rigid insulation boards are fitted between or behind the battens at this stage. Mineral wool or rigid phenolic and polyisocyanurate boards are the most common choices. The insulation is mechanically fixed to the wall and the battens are then fixed through it into the masonry behind.
The board installation starts at the base of the wall with a starter course. Getting this first course level and at the right height above the finished ground level is critical - every course above it follows from it. A ventilated cavity closer is fitted at the base to keep pests and debris out of the cavity while allowing air circulation.
Boards are then fixed course by course working upward. The fixing method depends on the material. Timber featheredge boards are typically face-fixed with stainless steel ring-shank nails or screws. Composite boards often use concealed clips that slot into the board profile, hiding the fixings entirely. Fibre cement boards use face-fixed screws with matching head covers. Each system has its own specific requirements for fixing centres, edge distances and expansion gaps.
Expansion gaps are not optional. Composite and fibre cement boards expand and contract with temperature and moisture. A board butted tight with no gap will buckle in warm weather. The gap sizes are specified by the board manufacturer and must be followed precisely.
This is where a quality installation is distinguished from a poor one. Every corner, every window reveal, every door surround, every pipe or vent penetration needs a properly detailed trim or flashing. Water always finds the weakest point, and on a cladding system, the weakest points are the junctions between the board and something else.
External corners can be handled with a purpose-made corner trim (the simplest method) or with mitred boards that meet neatly at the corner (neater but more labour-intensive). Window and door surrounds require a trim that laps over the board edge and ties back to the window frame with a bead of appropriate sealant. Pipes and vents need collars that are correctly sealed and allow the wall to drain.
Flashings at the top of any cladded elevation - where the boards meet the soffit, the roof or a higher part of the wall - must be weather-tight. This is where a roofer's understanding of weather-tightness adds real value: flashing details on a cladding job are no different in principle to flashing details on a roof.
Once all boards, trims and flashings are in place, the whole elevation is checked. We look for any gaps in sealant lines, any fixings that are not fully driven, any expansion gaps that are over or under tolerance, and any trim that is not sitting tight. Boards are wiped down to remove any marking from installation.
Scaffold is struck, spoil from preparation is cleared and skips or bags are removed from the property. You should expect to be left with a clean site and a wall that looks right and is properly detailed at every junction.
Ask specifically what preparation is included in the price, how the contractor will handle window and door reveals, and whether all trims and flashings are included in the quoted cost or are extras. A quote that does not make these things explicit is worth querying before you sign anything.
We fit exterior cladding in Isleham and across the Mildenhall area. Call us to arrange a site visit and we will walk through exactly what your project involves before any price is agreed.
No obligation · We'll call you to arrange a free visit
Call any time. Calls are answered day and night and passed straight to our roofers.