Mildenhall Roofers fits timber, composite, fibre cement and metal exterior cladding for homeowners in Lakenheath - and this page is about how to look after it properly once it is on the wall.
Call any time. Calls are answered day and night and passed straight to our roofers.
Exterior cladding protects your walls from wind and rain, helps manage heat loss through the building envelope and gives the outside of your home a clean, finished appearance. It does that job well when it is properly installed and kept in reasonable condition. Neglected cladding does not fail dramatically overnight - it deteriorates gradually, and the problems that appear after years of neglect are considerably more expensive than the maintenance that would have prevented them.
Every cladding material has different aftercare needs. Getting them wrong - over-treating, under-treating or using the wrong products - can shorten the life of the boards just as much as doing nothing at all. The sections below cover what good maintenance looks like for the main types of cladding used on homes in the Lakenheath and Mildenhall area.
Timber is the most maintenance-intensive of the common cladding materials. The interval between treatments depends on the species, the original finish and how exposed the elevation is, but as a general guide, oiled finishes typically need refreshing every two to three years and painted finishes every four to six years. These are starting points, not absolutes - if the finish is visibly fading, flaking or losing its water-repellent quality, treat it regardless of how long ago the last coat went on.
Before re-treating, clean the boards. A gentle wash with warm water and a soft brush removes surface algae, lichen and dirt. Avoid pressure washing at close range - it can force water into the grain and along joints, damaging the very seal you are trying to maintain. Let the wood dry completely before applying any new finish. Applying oil or paint to damp timber traps moisture under the film and causes it to peel within months.
Check fixings annually. Timber expands and contracts with moisture and temperature change. Over time, face fixings can work slightly loose or start to show rust staining. A stainless steel fixing that is slightly proud of the surface can be driven home gently. A steel fixing that is corroding needs replacing before it stains the surrounding wood or splits the board as the rust swells.
Pay attention to end grain. The cut ends of timber boards are where moisture enters fastest if they are not sealed properly. Where boards have been cut on site at junctions or around openings, the end grain should have been sealed at installation. If those ends are checking (showing small cracks), apply a liberal coat of end-grain sealer before the next full treatment cycle.
Composite boards are made from wood fibre and polymer, and they do not need painting, oiling or staining. That makes them considerably easier to live with than timber. But lower maintenance is not the same as no maintenance, and leaving composite cladding unchecked for years creates avoidable problems.
An annual wash is good practice. Organic material - algae, lichen, airborne dirt - can build up on the surface over time, particularly on north-facing elevations that get less sun. A dilute detergent solution and a soft brush deals with most surface growth. Avoid abrasive pads, which can scratch the surface finish. Some manufacturers specify their own cleaning products; if you have the product documentation, follow that guidance.
Check the joints between boards and the sealant at junctions with window frames, corner trims and flashings. Composite boards expand and contract with temperature changes - the gaps at joints are intentional and should not be filled. But the sealant at fixed junctions (where the cladding meets a frame or flashing) can dry out and crack over time. A failed sealant joint is a route for water to get behind the boards. Replacing it is straightforward and inexpensive if caught early; leaving it allows water to sit against the batten or wall behind.
Check that the ventilation gaps at the base of the installation are clear. Composite cladding is installed with a gap at the bottom to allow the cavity behind to breathe. Leaf litter, debris and soil migration can block this over time. A blocked base gap holds moisture against the bottom boards and can accelerate deterioration of the batten behind.
Fibre cement boards are dense, stable and resistant to moisture, but they are usually supplied pre-primed and rely on a painted finish for full protection. Fibre cement cladding in good condition on a typical home in this area generally needs repainting every eight to twelve years, though the interval varies with paint quality and exposure. Keep an eye on the painted surface - if it starts to chalk, peel or show hairline cracks, it needs attention before water can work into the board through those fissures.
When repainting, clean the surface first and allow it to dry fully. Use a paint specified for fibre cement - standard exterior masonry paint is not always appropriate. A microporous exterior paint allows moisture vapour to escape from the board surface rather than trapping it under the film. Two coats to the correct coverage rate will outlast one heavy coat every time.
Sealant at junctions is particularly important on fibre cement because the boards themselves are less flexible than composite or timber. Any movement at the junction between the board and a fixed frame tends to open the sealant joint. Check these annually and re-seal where needed using an appropriate exterior-grade flexible sealant.
Coated steel and aluminium panel systems need very little routine maintenance. The factory-applied coating is designed to last for many years without intervention. However, a periodic check is still worthwhile. Look for any areas where the coating has been chipped or scratched - a small touch-up with the appropriate paint prevents the exposed metal from beginning to corrode underneath the surrounding film.
Pay attention to fixings and junction seals. Metal expands and contracts with temperature more than most other cladding materials. Fixings that were correctly torqued at installation can work slightly loose over years of thermal cycling. A loose panel that is allowed to flex in the wind will eventually fatigue the fixings and the panel edges. Checking periodically and tightening where needed is simple preventive work.
Regardless of the material fitted, a brief annual inspection of the whole elevation catches small problems before they become large ones. Walk around the building and look for:
Catching any of these early means a small repair rather than a section replacement. Most of them can be dealt with without scaffolding if the elevation is not too high.
Exterior cladding sits at the junction between wall and roof. The flashings that manage that junction, the soffits and fascias above the cladding, and the way the top of the cladding is terminated all fall within the scope of a roofer as much as a cladding installer. If you notice water staining appearing on an inside wall near the top of an elevation, or if the fascia above the cladding is showing signs of moisture damage, the problem may be with the roof-to-cladding junction rather than the cladding surface itself. A roofer is the right person to inspect that.
Similarly, if fixings are failing or boards are moving, the cause is often behind the boards rather than at the surface. A decorator can repaint boards, but only a cladding or roofing contractor can properly check the batten, the ventilation cavity and the fixings without disturbing more than is necessary.
If you are having new cladding fitted on your Lakenheath home, ask the contractor at completion to walk you through what the boards need and when. A good installer will be able to tell you the treatment interval for whatever material has gone on the wall, what products are compatible with the surface finish and where the sealant joints are so you can check them yourself. That information is worth more than a glossy brochure.
We fit timber, composite, fibre cement and metal cladding systems in Lakenheath and the wider Mildenhall area. If you want to talk through a new installation or need an inspection of existing cladding, call us to arrange a site visit.
No obligation · We'll call you to arrange a free visit
Call any time. Calls are answered day and night and passed straight to our roofers.