If lead flashing, a valley or a flat lead roof is giving you trouble in Isleham, here is exactly what good lead work involves from the first look to the final tidy-up.
Call any time. Calls are answered day and night and passed straight to our roofers.
Lead is the material used wherever a roof meets a wall, a chimney, a skylight or a change in pitch. When it is properly installed, it outlasts almost everything else on the roof. When it is poorly fitted or starts to fail, it is one of the most reliable ways for water to get into your home. Cracked or slipped flashings, open laps in lead valleys and lifted soakers all let water track behind the visible surface and into the structure before you notice any staining inside.
Lead work covers three main areas: flashings (the strips that seal the junction between a roof slope and a vertical surface), valleys (the channels that carry rainwater from the junction of two roof slopes), and flat lead roofs (a traditional covering still used on bay roofs, porches and extensions). Each requires different techniques, different Code lead and a different approach to thermal movement.
Customers in Isleham sometimes ask what actually happens when we come out to do lead work. Understanding the process helps you judge whether a quote is realistic and whether the work has been done properly. Here is a plain account of how a sound lead job unfolds.
The first task is to get eyes on the lead from close range, not just from the ground. A roofer who quotes from the pavement is guessing. On a chimney flashing job, for example, the cause might be a cracked step flashing, a failed back gutter, mortar that has shrunk away from the lead, or lead that was never properly coded (too thin) in the first place. You cannot tell which without getting up there.
During the inspection we check the existing lead for its Code number. Lead is graded by thickness and weight per square metre. Code 3 is the lightest and is only suitable for soakers. Code 4 is the standard for step and cover flashings. Code 5 is used for valleys and flat roofs, and Code 6 for more demanding flat roof applications. Using the wrong Code is a common source of early failure because thinner lead cracks when it expands and contracts through the seasons.
We also look at how the existing lead is fixed and lapped. Lead expands significantly with heat and must be able to move without buckling or pulling away from fixings. Sheets that are too long, fixed too rigidly or lapped without enough overlap will fail regardless of their Code. These are details that only show up at close inspection.
At this stage we can tell you clearly whether repair is viable or whether replacement is the right call. On older properties, lead that has been patched several times with sealant is usually cheaper to replace properly than to patch again. Sealant is not a lead repair; it is a temporary measure that delays the proper fix.
On a replacement job, the old lead is carefully removed. This matters for two reasons. First, the masonry or timber underneath needs to be assessed before new lead goes on. Pointing that has cracked, rotten tilting fillets, corroded clips or wet timber all need attention at this stage. Putting new lead over damaged substrate is a mistake that comes back to cause problems.
Second, lead can be recycled. Old lead has scrap value and should be taken away properly. If a contractor leaves the old lead in a skip or charges you a separate disposal fee without any acknowledgement of the scrap, that is worth querying.
During strip-out we protect the area below. Lead off a high chimney or valley can damage tiles, gutters and anything on the ground beneath. Proper covering and careful handling are part of doing the job safely.
Any failed pointing is raked out and repointed before new lead goes in. On chimneys, this typically means repointing the joints where the flashing sits, and sometimes the chimney stack itself if the mortar has deteriorated badly. If the chase (the slot cut into the masonry to receive the lead) is in poor condition, it is re-cut cleanly. A clean chase gives a proper seat for the lead and allows the correct fixing.
On timber substrates, such as a valley board or the decking under a flat lead roof, any soft or wet timber is replaced. New lead dressed over rotten timber will not last because the fixing cannot hold and the surface is uneven. This prep work is unglamorous but it is what separates a long-lasting job from one that fails in a few years.
On flat lead roofs, the boarding must be smooth, properly supported and correctly ventilated underneath to avoid condensation. On bays and extensions, the joists and decking often need attention before any new covering goes on.
Lead dressing is the skilled part of the trade. Sheets are cut to the correct dimensions, allowing for the right overlaps at laps (minimum 100mm on flashings) and the correct drip or welt at edges. On flashings, the lead is dressed by hand using a dresser and bossing mallet to form neat corners and to push the lead tight into the chase.
Individual sheets are kept to the correct maximum length to allow for thermal movement. On flashings this is typically 1.5 metres per sheet. On flat roofs and valleys, the layout of sheets and the positioning of drips and rolls controls movement across the whole surface. A drip is a step formed in the lead to allow water to shed at the edge of each sheet; a roll is a timber batten covered in lead to join sheets along the length of a flat roof. Both are functional, not decorative.
The lead is then secured using lead clips or tacks fixed to the substrate, and the top edge is turned into the cleaned-out chase. On chimneys and walls, the chase is then pointed up with a mortar mix that holds the lead but still allows a small amount of movement. Solid filling of the chase with rigid mortar is a mistake that causes the lead to crack as it moves.
Before coming down, a good lead worker checks every lap, every dressed corner and every length of pointing. The lead should be flush to the wall, with no visible gaps at the top edge and no open laps where water could enter. On valley work, the channel needs to be clear of debris and the lead needs to be properly turned under the tiles on each side.
On flat lead roofs, all drips and rolls should be neat, all edges properly welted or dressed to the drip and the surface free of standing water when the fall is correct. A flat roof with no fall is a problem; lead flat roofs should have a minimum fall of 1:60 and ideally more to prevent ponding.
Tile fragments, mortar dust, old lead and fixings all come down from the roof and are removed. The gutters below should be cleared of any debris that has fallen in during the work. If any tiles were lifted to gain access to soakers or valley lead, they go back on properly, not just propped back in position.
At the end of the job you should be able to see clearly what has been done and be left with no mess. If you were told which Code lead was used, you now have a record you can pass on if you sell the house.
A common problem is lead that has been installed without adequate overlaps. Flashings lapped less than 75-100mm will allow wind-driven rain to push back up underneath. Another common problem is lead dressed too long in single pieces without a break for movement. In warm weather the lead expands, buckles and eventually cracks along the fold lines.
Soakers are a separate element that sits behind step flashings on a tiled roof. They are individual pieces of lead cut to interleave with each course of tiles and the abutment flashing. A roof without soakers, or with soakers that are too short, will almost always leak eventually because the step flashing alone cannot seal every course against driven rain.
Chimney back gutters are another frequent source of problems. The back gutter sits between the back face of the chimney stack and the roof slope behind it. It collects all the water coming down the slope above and channels it to each side. If the back gutter is undersized, too shallow or blocked with debris, water backs up and finds its way under the slates or tiles. Back gutters need to be generous in size and kept clear.
On flat lead roofs, a common failure point is the upstand at the perimeter. The lead must turn up against the surrounding wall or parapet by at least 150mm. If the upstand is too short, water can get behind the lead in heavy rain. Upstands also need to be secured and pointed at the top edge just like a flashing.
Open lead valleys are the exposed channel of lead running between two roof slopes. They should be wide enough to carry the full volume of water from both slopes in heavy rain. A minimum girth of 600mm for the lead in the valley is a reasonable starting point, with more on larger roofs or steeper pitches that shed water quickly.
The lead in the valley must be properly dressed to the tiles or slates on each side and secured so it cannot lift in wind. The lower edge needs to discharge cleanly into the gutter. If the lead valley stops short of the gutter, water runs back under the lowest course of tiles.
Alternatives to open lead valleys include mortar-bedded valleys (closed valleys), where cut tiles are bedded in mortar with no lead channel visible. These can fail as mortar cracks and vegetation grows in the joints. Lead valleys, properly installed, are generally more reliable long-term because there is no mortar to crack and the channel is visible and can be inspected.
A lead flat roof on a bay window or small porch extension will typically cost more per square metre than a felt or EPDM rubber system, but lead has a longer expected lifespan when correctly installed and maintained. Current lead prices fluctuate with the commodity market, so any quote should specify the Code, weight and approximate area being used.
For small flat roof areas in Isleham and nearby, a lead flat roof using Code 5 lead typically costs in the range of £150 to £250 per square metre installed, depending on access, the condition of the deck and whether any boarding needs replacing. These figures reflect typical current UK rates and are a guide, not a fixed price. Get at least two itemised quotes and check that both specify the Code lead and the method of fixing.
EPDM rubber is a reasonable alternative on larger flat roofs where the cost of lead would be prohibitive. It is a single-ply membrane that is glued or mechanically fixed to the deck. On smaller traditional roofs, particularly on bay windows and porches on older properties, lead is the traditional and often the most appropriate material.
A contractor who cannot or will not answer these questions clearly is worth approaching with caution. Lead work done to a poor standard is expensive to put right because it often means stripping everything back to the substrate and starting again.
Mildenhall Roofers carry out lead flashing, valley and flat roof lead work in Isleham and the surrounding villages. All lead is dressed by hand to the correct Code and secured using proper fixings, not sealant as a substitute for the right detail. If you have a leak at a chimney, skylight, valley or flat roof junction, or if you want to know the condition of existing lead before a problem develops, call us to arrange a roof survey.