Lead work is one of the most skill-dependent parts of any roofing job, and it is one of the most common reasons a roof that looks fine from the ground is quietly letting water in.
Call any time. Calls are answered day and night and passed straight to our roofers.
Lead work covers several distinct parts of a roof. Flashings seal the joint where a roof meets a wall, a chimney stack, a dormer or a parapet. Valleys channel rainwater down between two roof slopes. Flat roof areas can be covered in lead sheet, particularly on bays, porches and extensions. Each of these applications demands a different technique, a different lead thickness (referred to as the Code), and a different fixing method.
When any of these are missing, badly dressed or installed in the wrong material, water finds its way in. The damage often shows up far from the source: a stain on a bedroom ceiling, damp in a chimney breast, or rot in a rafter you cannot see without lifting the felt. Identifying the true source of a lead-related leak takes experience, because water travels before it drops.
This page goes into detail on materials, because the choice of material is where most lead work decisions are made and where most misunderstandings arise. If you are getting quotes from more than one roofer for lead work in West Row or nearby, understanding what you are being offered is the most useful thing you can know.
Traditional milled lead is still the benchmark material for flashing and valley work on pitched roofs. It is produced by rolling refined lead into sheet form, and it has been used on British roofs for centuries. Milled lead is dense, malleable and, when correctly installed, extremely long-lasting. Manufacturer guidance suggests correctly installed lead flashings can last 60 years or more, though lifespan depends heavily on Code, fixing method and exposure.
Lead sheet is sold by Code number, which indicates its thickness and therefore its weight per square metre. The Code determines what the lead is suitable for:
Using the wrong Code is a common cause of premature failure. A roofer fitting Code 3 where Code 5 is needed is not just cutting corners on cost; they are fitting something that will crack, pull away from fixings or develop pinhole fatigue fractures within a few years. When asking for a quote, ask which Code is being specified for each part of the job.
Sand cast lead is produced by pouring molten lead onto a sand bed, then skimming it flat. The result is a sheet with a slightly rougher, more textured surface than milled lead, and a grain structure that some roofers regard as more resistant to fatigue cracking in certain situations. It is less uniform in thickness than milled sheet, which means experienced hands are needed to cut and dress it accurately.
Sand cast lead is less common than milled lead in general roofing work, and it tends to be used in conservation and heritage applications where a traditional appearance matters. If your property in West Row is a listed building or falls within a conservation area, it is worth asking whether sand cast lead is required or preferred before work begins.
Some roofers substitute lead with lead-effect alternatives such as zinc-based flashings or aluminium-core products sold under brand names. These materials are quicker to fit and cheaper to buy. They are also widely used and not inherently wrong for every situation. However, they are not the same as lead, and you should know what you are getting.
Zinc flashings are harder and less malleable than lead. They can be difficult to dress tightly into irregular masonry joints, which means they are more prone to leaving small gaps. In hard-water areas, the natural patina that seals and protects zinc can be disrupted by run-off chemistry. Aluminium-core products are even lighter and easier to handle, but they are not as long-lived as Code 4 or Code 5 milled lead in exposed positions.
There is a place for these materials: a small, straightforward flashing on a sheltered lean-to, for example. But for chimney flashings, valley work, parapet gutters or any detail where failure will cause serious water damage, genuine milled lead at the correct Code is the appropriate choice. If a quote is significantly cheaper than others, it is worth asking exactly what material is being used.
Not every flat section needs to be covered in lead. Bay tops, porch roofs and small flat extensions are sometimes better suited to EPDM rubber membrane or modern torch-on felt systems, which are lighter, easier to lay and less expensive per square metre than lead. Lead flat roofs are extremely durable when laid correctly, but they require expansion joints at the right intervals (no single piece of lead sheet should exceed 1.5 metres in any direction without an expansion detail), correct falls to drain water, and careful attention to edge detailing.
Where the surrounding flashings and upstands are in lead, it often makes sense to use lead for the flat covering too, so that the whole detail is in one material with compatible expansion characteristics. Where the flat area is large, a combination approach - EPDM or torch-on felt for the main deck, lead for the flashings and upstands - is a practical and cost-effective solution that many experienced roofers would recommend.
Lead has been used on British roofs for longer than almost any other roofing material, and for good reason. But it is not the right choice in every situation, and no honest tradesperson would claim otherwise.
Understanding why lead work fails helps you assess what you are being quoted for and whether a repair or a replacement is the right call.
A common problem with chimney flashings is that the lead has been pointed into the mortar bed joint rather than properly tucked into a cut chase. Mortar pointing looks fine initially, but it shrinks and cracks over time as the lead moves with temperature changes. Water then tracks behind the flashing and into the chimney breast. The correct fix is to cut a chase into the masonry with an angle grinder, tuck the lead into it, and secure it with lead wedges before pointing with a flexible mortar or mastic.
Valley failures are often the result of the wrong Code being used, or sheets being laid too long without expansion details. Lead in a valley sees a lot of water movement and thermal cycling. Fatigue cracking - fine splits in the lead that are almost invisible from ground level - allows water to seep through gradually. By the time the ceiling stain appears, the underlying timbers have often been damp for months.
On flat lead roofs, the most common failure is at the edges and upstands. Lead that has not been dressed firmly into the wall or parapet allows wind-driven rain to get behind it. Expansion joints that are missing or inadequate cause the sheet to ripple and eventually crack along the fold lines.
When lead work is done correctly, each section of lead is dressed by hand to follow the profile of the surface beneath it. Flashings are cut into the masonry, not surface-pointed. Soakers are fitted under each slate or tile course at a chimney or abutment, not replaced with a single piece of turned-up lead. Valley boards are sound, and the lead valley is of the correct Code and roll profile for the pitch and exposure of the roof.
Each piece of lead sheet is kept within the length limits recommended by the Lead Sheet Association - generally no longer than 1.5 metres in any direction for flat or low-pitched work, to allow for thermal movement. Fixings are lead clips or clips in a compatible metal, not nails through the sheet face. Joints are lapped in the correct direction relative to water flow, with no uphill laps that could trap water.
Before any new lead is laid on an old roof, the underlying structure needs to be assessed. Rotten valley boards, failed sarking felt and damaged battens all need to be addressed before the lead goes on, because access afterwards means stripping the lead again. Ask your roofer what they will be checking and replacing as part of the job, not just what the lead itself will cost.
Lead work is priced partly by the complexity of the detail and partly by the amount of lead required. The cost of lead sheet itself fluctuates with commodity prices, and quotes from six months ago may not reflect current material costs.
As a rough guide for domestic work:
These figures are indicative and current typical UK ranges. Any quote should specify the Code of lead being used, which sections are being replaced or repaired, and what preparatory work is included. A quote that does not specify the Code of lead is one worth questioning.
Not all lead work needs replacing when it develops a problem. Lead that is sound in structure but has lifted slightly from a chase can often be re-secured and re-pointed at reasonable cost. A small split in an otherwise healthy piece of Code 5 valley lead can be patched with a lead patch and appropriate sealant as a short-term measure.
Replacement is the right call when the lead itself has fatigued - visible cracking across the surface, significant blistering, or sections that have lost their shape through thermal cycling over many years. If the underlying boards or felt are also compromised, replacement gives the opportunity to address everything at once, which is cheaper in the long run than multiple call-outs.
A roofer who can show you what they have found and explain why repair is or is not viable is the kind of tradesperson worth working with. If you are not sure whether a repair is genuine or a sales pitch for a full replacement, a second opinion from another local roofer costs nothing and can save you a significant sum.
If you have a lead flashing, valley or flat roof section that is leaking or suspect, call Mildenhall Roofers for a roof survey. We cover West Row and the surrounding area from our base in Mildenhall. We will tell you exactly what Code of lead the job requires, what preparatory work needs to happen first, and what the alternatives are where they genuinely apply.
Ask us for a written breakdown of materials and labour so you can compare quotes on a like-for-like basis. That is the clearest way to know you are getting the right job at a fair price.
No obligation · We'll call you to arrange a free visit
Call any time. Calls are answered day and night and passed straight to our roofers.