If you need lead flashing, valley lead or flat roof lead work in Worlington, getting the contractor and specification right from the start will save you from costly repeat repairs.
Call any time. Calls are answered day and night and passed straight to our roofers.
Lead work covers several distinct jobs on a roof: step and cover flashings where a roof meets a wall or chimney, soakers tucked under each slate or tile course alongside a chimney, valley gutters running into the V-shaped junction between two roof slopes, and sheet lead laid over flat or low-pitch sections. Each of these requires a different technique and, in most cases, a different Code of lead.
Lead is sold in Codes numbered 3 to 8, with higher numbers being thicker and heavier. Code 3 and 4 are used for soakers and light flashings. Code 4 and 5 for standard step and cover flashings and chimney aprons. Code 5 and 6 for valleys and larger abutments. Code 6 and above for flat roof sections. Using the wrong Code is one of the most common causes of premature failure, and it is one of the first things worth asking a contractor about.
All lead must be dressed by hand to fit the surface beneath it. Machine-pressed or pre-formed lead sections do exist, but hand dressing gives a tight, weatherproof fit around irregular masonry and tile profiles. The material needs to be properly clipped and secured so it can move slightly with changes in temperature without pulling away from the mortar joint or buckling.
Lead work fails for several reasons. Mortar joints that hold the lead into a masonry chase crack over time as the joint dries out and the lead expands and contracts with the seasons. When the pointing fails, water gets behind the flashing and into the roof structure below. Repointing the chase and re-bedding the lead properly solves this; simply running a bead of mastic over the gap is a short-term fix that will fail again within a year or two.
Poorly sized sections are another common problem. Lead should be installed in lengths no greater than 1.5 metres for standard flashings, and shorter for steeper pitches and valley work. Longer sections cannot move freely and will crack at stress points, usually at fixings or bends. A crack in a lead section looks minor but lets water track underneath the flashing and into the roof deck or ceiling below.
Inadequate overlap at joints is a further cause of failure. Any lapped joint in lead work needs a minimum 100mm overlap, and on a shallow pitch or exposed run, more. Joints bedded on mastic alone without a proper mechanical lap will open over time. On valleys especially, where water volume is highest during heavy rain, a poorly lapped joint will leak under pressure long before it would fail in dry conditions.
Soakers that are too short or set at the wrong angle allow water to track back under the tiles at the sides of a chimney stack. The correct soaker length depends on the tile gauge and pitch, and this is a calculation rather than a guess. When soakers are wrong, the leak appears at the base of the chimney inside the house, sometimes months after the original work because water finds its way slowly through the roof structure.
Choosing a roofer for lead work is different from choosing one for a straightforward retile. Lead work is a craft skill. Not every general roofer has the experience to carry it out correctly, and poor lead work can be difficult to spot until the next heavy rain. The questions below will help you tell an experienced contractor from one who is less sure of the detail.
A contractor who knows their trade will give you a specific answer: Code 5 for the step flashings, Code 4 soakers, Code 6 for the valley, for example. If the answer is vague, that is worth noting. The Lead Sheet Association publishes guidance on minimum Codes for different applications, and a competent roofer will follow it. Ask the contractor to confirm the Code in writing before work starts so there is no ambiguity later.
As noted above, lead expands and contracts with temperature changes. Maximum section lengths exist for good reason. Ask how long each section of flashing will be and how it will be fixed. Correct fixings are purpose-made lead clips, not nails through the face of the lead or reliance on the mortar joint alone. If a contractor cannot explain how they will secure the lead to allow for thermal movement, that is a warning sign.
The chase is the groove cut into the mortar joint or brickwork that the top edge of a flashing is turned into and pointed up. On older properties the joint may be soft lime mortar; on more recent construction it will be sand and cement. The pointing mix matters: too strong a mix in an old lime joint will crack the surrounding brickwork. Ask the contractor what pointing mix they intend to use and whether it is compatible with the existing masonry. A one-size mortar approach is not always correct.
If you are having existing lead work replaced, ask whether you can see the old sections once they come off. A good contractor will show you where the failures are and explain why they occurred. You can then make a more informed decision about whether the specification for the new work addresses those failures. It also helps you understand whether the problem was workmanship, material specification or simply age.
Lead work on a chimney, valley or upper roof slope nearly always requires safe access. Proper scaffolding costs money but allows the work to be carried out safely and accurately. A contractor who proposes to do chimney lead work from a ladder alone may be cutting costs in a way that affects the quality of the finished job, because certain dressing operations simply cannot be done well from an unstable platform. Ask how access will be arranged before agreeing to the work.
Lead is priced by the kilogram, and the Code and total area determine the material cost. A contractor who can break down the quote into lead material, any ancillary materials such as clips and mortar, and labour is demonstrating that they know what they are doing. A single lump-sum figure with no detail makes it harder to understand what you are paying for and harder to compare with another quote.
Lead work rarely exists in isolation. A chimney repoint may be needed at the same time as the flashings. Tiles around a valley may need re-bedding or replacing. The lead fix on a flat roof section depends on the condition of the decking below. Ask what the contractor proposes to do about the surrounding structure and whether they have checked it. A job that replaces the lead but ignores a cracked chimney pot or loose tiles nearby will need revisiting sooner than it should.
For any lead work job above minor patching, getting two or three quotations is sensible. The cheapest is not always the worst, and the most expensive is not always the best. What you are looking for is a contractor who can answer the questions above confidently, whose specification matches what the job actually requires, and whose price reflects the correct materials and adequate time to do the work properly.
Lead work is priced on a combination of material weight and the complexity of the job. As a general guide, replacing step and cover flashings to a standard chimney stack in Worlington or the surrounding area typically costs in the region of £400 to £900 depending on the size of the stack and the amount of lead required. Valley replacement in lead rather than a modern alternative runs from around £600 to £1,500 or more for a longer or more complex valley. Flat roof lead sections vary considerably with area; sheet lead for a bay window or small flat is often £300 to £700 for the lead work element alone, separate from any deck repair.
These figures are indicative of current UK costs and will vary with the specific Code required, access difficulty, and the condition of the surrounding structure. Any figure significantly below these ranges is worth questioning in terms of the specification being offered.
Lead is not the only flashing material available. Aluminium, zinc and various proprietary self-adhesive butyl or bitumen-backed tapes are all used in roofing. Each has its place, but lead remains the most durable option for exposed or complex junctions on pitched roofs when correctly installed. A properly dressed lead flashing on a chimney or valley, made from the correct Code, will typically outlast most other materials by a significant margin.
Self-adhesive flashing tapes are often used as a repair material, and they can be effective on clean, sound surfaces in less exposed positions. They are not a like-for-like replacement for lead in a chase joint or a fully dressed valley. If a contractor proposes to replace lead flashings with a self-adhesive product in a location where the original specification called for lead, ask them to explain their reasoning. There are situations where it is appropriate, but also many where it is not.
Zinc flashings are used on certain modern and heritage roofing projects and share some of lead's advantages in terms of longevity and workability. They require different jointing techniques and different fixings.
Flat roofs on extensions, bay windows, outriggers and porches are sometimes covered in lead sheet rather than felt or EPDM rubber. Sheet lead on a flat surface needs falls of at least 1 in 80 to drain properly, and the decking underneath must be sound and dry before the lead is laid. Lead on a flat surface is laid in bays with drip edges and welts at the joints; these must be formed correctly to allow movement and to prevent water from backing up at the joints during heavy rain.
The most common failure on a flat lead roof is a cracked or open welt at a bay joint, which allows water to sit against the lead and eventually find its way through. Repairing a single welt is straightforward if the surrounding lead is in good condition. If the lead has thinned significantly or multiple bays are affected, a full replacement is more cost-effective than repeated patching.
A chimney stack has several lead elements, and all of them need to be present and correct for the chimney to remain watertight. The front apron covers the junction at the bottom of the front face of the stack where it meets the roof slope. Step flashings run up each side, one step per tile or slate course. Soakers are cut and shaped to sit between each tile and the brickwork, linking up with the step flashings. The back gutter or back flashing covers the junction at the top rear of the stack.
On a chimney that has been repointed repeatedly over the years, the chase for the flashings may be in poor condition or may have been filled with expanding foam or mastic by a previous contractor. Clearing this out properly before re-cutting a chase and repointing it with the correct mix is a necessary part of the job, not an optional extra. Skipping it means the new flashing will fail at the pointing joint in the same way the old one did.
Lead work on a chimney or valley typically takes one to two days for a straightforward job, longer if there is significant chimney repair or deck work alongside it. The lead will be dressed in sections, clipped and turned into the chase, then pointed up. Some contractors use a lead mortar compound for the pointing; others use a sand and lime mix. Both are acceptable; what matters is that the joint is fully filled, properly formed, and compatible with the surrounding masonry.
After the work is complete, ask to see the finished flashings before the scaffolding comes down if that is practical. Check that the pointing is full and that there are no obvious gaps. Newly dressed lead will be a bright silver colour and will weather to a grey over the following months. Any temporary discolouration from patination fluid, sometimes applied to prevent run-off staining on light-coloured masonry, should be explained to you before it is used.
Lead work does not need ongoing maintenance beyond an occasional visual check from ground level or from a safe vantage point. Look for any lifting at the bottom edge of a flashing or any open joints in the pointing. Catching these early, before water has had time to track into the structure below, keeps repair costs low.
We carry out lead flashing, chimney lead, valley work and flat roof lead across Worlington and the surrounding area including Mildenhall. All lead is dressed by hand to the correct Code and properly fixed. Call us to arrange a survey and a clear, itemised quotation for your job.
No obligation · We'll call you to arrange a free visit
Call any time. Calls are answered day and night and passed straight to our roofers.