If you're planning a new roof in Isleham, here's exactly what the job involves from the first inspection through to the final clean-up - so you know what to expect at every stage.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01638 597994
New Roofs · Isleham

Expert New Roofs
in Isleham

Installing a New Roof: The Full Process Explained

Mildenhall Roofers installs new roofs in Isleham and the surrounding area. Whatever the property type - detached house, bungalow, garage or extension - the process follows a clear sequence. Understanding it helps you plan, ask the right questions and know whether a job is being done properly.

Stage 1: The Initial Inspection

A proper new roof starts before any material is ordered. A thorough inspection looks at the existing covering, the condition of the felt underlay, the state of the timber structure and the flashings around any chimneys, vents or roof windows. This isn't just a visual check from the ground - it involves getting up there and looking closely.

The inspection tells you whether a full replacement is genuinely needed or whether targeted repairs would extend the roof's life further. It also identifies any structural issues - sagging rafters, rotted wall plates, failed ridge boards - that need to be addressed before a new covering can go on. Laying a new roof over a damaged structure is a false economy: the problem doesn't go away, it just becomes harder to access.

A clear, honest inspection report is the foundation of a fair quote. If a roofer can't tell you specifically what condition the timbers are in, that's a question worth pressing before you agree to anything.

Stage 2: Specification and Materials

Once the inspection is done, the specification is drawn up. This sets out the exact materials to be used: the tile or slate type, the felt or membrane specification, the batten size and treatment, the ridge and hip system, flashing materials and any lead work required.

The pitch of the roof dictates which materials can be used. Many tile profiles have a minimum recommended pitch; below that minimum, water doesn't shed quickly enough and works back under the laps. Getting the specification right at this stage prevents problems later.

For flat roofs on extensions or garages, the specification will cover the deck condition and the membrane system - EPDM rubber or torch-on felt are the most practical options for most domestic properties.

Stage 3: Scaffolding and Access

On most full roof replacements, proper scaffolding is needed. Working from ladders alone is not safe or practical for a project of this scale. The scaffold should provide a safe working platform around all the areas being worked on and allow materials to be stacked safely at roof level.

Scaffolding is a cost that's included in the overall project price, but it's worth asking specifically that it's accounted for in any quote you receive. Some quotes leave it out and add it later.

Notify your neighbours before the scaffold goes up. It's a courtesy, and it gives them a chance to move any vehicles or garden furniture that might be in the way during the installation.

Stage 4: Stripping the Old Roof

The existing covering is stripped back to the timbers. Tiles or slates are removed, the old felt underlay is taken off and the battens are taken down. This is when the full condition of the timber structure becomes clear. Any rot in the rafters, ridge or hip boards, or any movement in the wall plate, is identified and noted.

Debris is cleared as the work progresses. A skip positioned close to the property handles the volume of material coming off - old tiles and battens add up quickly. Protecting the garden and any paths below with boards or sheeting is standard practice during this phase.

If any structural repairs are needed, they happen now, while the roof is open and accessible. Replacing a section of rafter or treating and sistering a cracked one is straightforward at this stage. Doing it later, under a finished roof, is a much bigger job.

Stage 5: Felt and Battens

Once the structure is confirmed sound and any repairs are complete, the new felt underlay goes on. Modern roofing felt is breathable, which reduces the risk of condensation building up in the roof void. It's fixed in horizontal runs starting at the eaves and overlapping up the slope so that any water that gets past the tiles runs down over the felt and out rather than in.

Tile battens are fixed over the felt. These need to be the right size for the tile being used and properly treated against rot. Batten gauge - the spacing between them - is set precisely to match the tile's recommended lap. Get this wrong and the tiles won't interlock correctly or drain properly.

Stage 6: Laying the New Covering

Tiling or slating starts at the eaves and works up to the ridge. The first course sets the alignment for everything above it, so it's checked carefully. Each course overlaps the one below at a lap determined by the tile specification and the roof pitch.

Hip and valley details are cut and fitted as the work progresses. Valleys can be formed with lead soakers, a lead gutter, or purpose-made valley tiles depending on the specification. Hips are tiled with matching hip tiles, dry-fixed where possible to avoid the maintenance issues associated with mortar bedding.

The ridge is fitted last. A dry-fix ridge system uses a ventilated filler unit and mechanical fixings rather than mortar, which eliminates the cracking and repointing that eventually affects traditional mortar-bedded ridge tiles.

Stage 7: Flashings, Chimney and Detail Work

All the junctions - chimney, roof windows, abutments with walls - are flashed with lead. Lead is cut, dressed and stepped into the mortar joints of brickwork where it meets a wall. At chimney bases, a back gutter and side flashings are installed to direct water away from the junction and down the slope.

Chimney pointing is checked and repointed where needed. A poorly pointed chimney stack is one of the most consistent sources of water ingress, and it's the right time to deal with it while the scaffold is still in place.

Stage 8: Inspection and Clean-Up

Once the covering and all the detail work is complete, the roof is inspected from the scaffold - checking alignment, ridge fixing, flashing laps and any areas where the cut is tight. Anything that needs dressing back or adjusting is done before the scaffold comes down, because once it's gone, access is gone with it.

The scaffold is struck and the site is cleared. All waste material - old tiles, battens, felt and packaging - is removed. The garden, paths and any surfaces below the working area are swept and checked. A new roof is a significant piece of work; the finish on the ground should reflect that.

Ready to Get Started in Isleham?

If you'd like to understand what a new roof on your Isleham property would involve in practice, call Mildenhall Roofers. We'll carry out a proper inspection, walk you through what we find and give you a clear price for the full job from stripping to clean-up.

Why choose Mildenhall Roofers?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01638 597994